<button id="y8ouu"><samp id="y8ouu"><noframes id="y8ouu">

  • <s id="y8ouu"><code id="y8ouu"><noframes id="y8ouu">
  • <span id="y8ouu"><u id="y8ouu"></u></span>

    <legend id="y8ouu"><output id="y8ouu"><small id="y8ouu"></small></output></legend>
    <s id="y8ouu"></s>
  • <label id="y8ouu"></label>
      <strong id="y8ouu"></strong>

      Case

      Home > Case> High-speed railway

      xi'an-chengdu high-speed railway

      image.png

      Xicheng High-speed Railway, also known as Xicheng Passenger Dedicated Line, is a high-speed railway connecting Xi ' an, Shaanxi Province, China and Chengdu, Sichuan Province. It is one of the main channels of the ' eight vertical and eight horizontal ' high-speed railway revised in 2016. It is the first high-speed railway crossing the Qinling Mountains in China.    Xicheng high-speed railway was officially opened on October27,2012.   On December 6, 2017, the whole line was officially opened.    Xi ’ an-Chengdu high-speed railway is from Xi ’ an North Station to Chengdu East Station, with a total length of 658 km and 22 stations. The designed maximum speed is 250 km / h.  As of January 2018, the speed of Xicheng high-speed railway is 250 km / h.    The display screen and server of our department ’ s winning bid for this project in 2016 are supplied to the Bureau of Railway Construction and Electrification, which is also the first project of our department to participate in high-speed rail.

      image.png


      COPYRIGHT富 FOBOM (Xiamen) Technology Co., Ltd. Mobile phone: 13720876105  fixed phone: 0592-7621905   閩ICP備2021009521號

      技術(shù)支持:廈門(mén)掘金

      亚洲激情中文字幕,欧美日韩国产亚洲人成,欧美日韩国产亚洲人成,欧美亚洲网 徐水县| 全椒县| 大足县| 平凉市| 深泽县| 山东| 安仁县| 三台县| 扬州市| 威宁| 阿合奇县| 兴隆县| 长宁县| 亚东县| 临湘市| 沁源县| 江口县| 乳山市| 铜川市| 朝阳县| 扶绥县| 谢通门县| 惠安县| 沭阳县| 济南市| 当雄县| 美姑县| 哈尔滨市| 英吉沙县| 长海县| 涿州市| 樟树市| 新绛县| 鱼台县| 普定县| 石首市| 习水县| 宜昌市| 巩义市| 布尔津县| 菏泽市| http://444 http://444 http://444 http://444 http://444 http://444