<button id="y8ouu"><samp id="y8ouu"><noframes id="y8ouu">

  • <s id="y8ouu"><code id="y8ouu"><noframes id="y8ouu">
  • <span id="y8ouu"><u id="y8ouu"></u></span>

    <legend id="y8ouu"><output id="y8ouu"><small id="y8ouu"></small></output></legend>
    <s id="y8ouu"></s>
  • <label id="y8ouu"></label>
      <strong id="y8ouu"></strong>

      Solution

      Home > Solution> Solution

      The Latest Development of Taizhou Urban Rail Transit Network Planning

      release time:2021-07-06publisher:FOBOM ( Xiamen ) Technology Co., Ltd

      The S1 line functions as the north-south fast track channel in the central urban area of Taizhou and the south-south fast track channel connecting Wenling and Yuhuan in the urban area, and connects the important integrated traffic nodes such as Toumen Port Area, Taizhou Station and Wenling Station.  The S2 line functions as the east-west fast track channel in the central urban area of Taizhou City, and connects the Huangyan City, Taizhou West Station, Jiaojiang City ( Taizhou Station ), Taizhou Bay New Area, Jinqing, Wenling East New Area, Songmen, Shitang and other important blocks and stations. Together with the S1 line, the cross fast track of Taizhou City is constructed.  The function orientation of S3 line is a fast rail transit channel connecting the central urban area of Linhai City and the central urban area of Taizhou City, which connects Linhai Station, Linhai South Station and Taizhou Station in series.   

       M line is the main service ' three districts two cities ' track line.  The function orientation of M1 line is the east-west track traffic line connecting Huangyan City and Jiaojiang City.  The function orientation of M2 line is the east-west track traffic line connecting Taizhou West Railway Station, Huangyan City, Luqiao City, Taizhou Airport and Taizhou Bay New Area.  The function orientation of M3 line is the north-south rail transit line connecting Jiangbei New District, Jiaojiang City, Luqiao City and Wenling City.  The function orientation of M4 line is to connect the rail traffic lines of Huangyan City, Yuan ( Qiao ) Sha ( Bu ) Gao ( Qiao ) Block, Jianyang Lake, Luqiao City and Taizhou Airport.  The function orientation of M5 line is an east-west rail transit line in Wenling City, which connects Wenling East New District, Ruo Heng Town, Wenling City District, Wenling Station and Daxi Town.    The basic guiding ideology of the recent implementation of urban rail transit in Taizhou is to form the radiation skeleton line with the center of the main city as the core as soon as possible

      hy4.jpg


      COPYRIGHT富 FOBOM (Xiamen) Technology Co., Ltd. Mobile phone: 13720876105  fixed phone: 0592-7621905   閩ICP備2021009521號

      技術(shù)支持:廈門(mén)掘金

      亚洲激情中文字幕,欧美日韩国产亚洲人成,欧美日韩国产亚洲人成,欧美亚洲网 永州市| 沾益县| 沙河市| 镶黄旗| 锡林浩特市| 溧阳市| 天水市| 保康县| 华宁县| 阳泉市| 铜山县| 榕江县| 潞城市| 枞阳县| 喀什市| 连州市| 黎川县| 陇南市| 陆丰市| 南充市| 甘洛县| 沈丘县| 金川县| 正安县| 固阳县| 沙湾县| 长顺县| 昔阳县| 黄大仙区| 楚雄市| 镇平县| 伊金霍洛旗| 休宁县| 安仁县| 江口县| 安徽省| 茶陵县| 汶上县| 怀宁县| 抚顺县| 祥云县| http://444 http://444 http://444 http://444 http://444 http://444